Category Archives: Road/path works

Midpul Bridge Closed 6 Feb – 20 Mar 2017

The Midpul Bridge will be closed for 6 weeks as works are undertaken to realign and extend the bridge. During the six week period, all cyclists and pedestrians are encouraged to utilise the newly constructed Temple Terrace intersection. See attached Midpul Bridge TEMPORARY CYCLEWAY DIVERSION FLYER Feb 2016

Also posted in Darwin, Palmerston | Leave a comment

Urgent Closure of Midpul Bridge

URGENT NOTICE Due to the discovery of power and water’s sewer lines running directly under a major pylon footing of the Midpul Bridge (cycle and pedestrian bridge over the Stuart Highway), the closure of the bridge and consequent rediversion of the existing cycleway has been postponed until further notice. Engineers are currently working on the […]

Also posted in Cycling News, Darwin, Palmerston | Leave a comment

Temporary bridge closure at CDU

One of the small timber bridges connecting from the Casuarina Foreshore path to CDU has become hazardous . The Department of Infrastructure has temporarily closed the bridge (alternative access is via the other bridge to the north). The bridge will be repaired as soon as possible and the broader path upgrade works will commence in […]

Also posted in Darwin | Leave a comment

Darwin Bike Plan 2014 – Have your say!

City of Darwin is developing a Darwin Bike Plan to be an integral part of Council’s strategy for catering for cyclists now and into the future. The objective of the plan is to establish a comprehensive approach to the development of a quality route network, supported by a range of initiatives and prioritised works which […]

Also posted in Darwin, Safety | Leave a comment

Works in Vicinity of Howard Springs Road and the NAR Shared Path

Cyclists and pedestrians are warned that there are currently a number of large work projects in the vicinity of the intersection with the NAR shared path at Howard Spring

Also posted in Darwin | Leave a comment

Resurfacing of Tiger Brennan Shared Path CBD to Woolner

Work is to commence on Monday 25 February 2013 (weather depending) to resurface key sections of the 3.8km shared path between McMinns Street on the edge of the Darwin CBD to the bottom of Woolner Road at Woolner. 

Posted in Road/path works | Leave a comment

Mindil Beach coastal path (Darwin High/Museum) closed

Darwin Cyclists: the entire Mindil Beach Coastal Walk extending from the Mindil Beach car park to Darwin High School will remain closed while repairs and maintenance is undertaken at Mangrove Walkway Bridge- we will advise as soon as we have a date for re opening.

Posted in Road/path works | Leave a comment

PAWC Electrical Works – Bagot Road, Ludmilla

From: NT Department of Transport The Power and Water Corporation is to undertake essential works to install electrical cables beside Bagot Road commencing Thursday 14 February 2013.  The works will be located under the footpath from the Bagot Road – Stuart Highway intersection along the outbound (western) side of Bagot Road to the driveway area […]

Posted in Road/path works | Leave a comment